Home        Specs        Blog        Crew        Location       Links        Daisy       Photos

THE HAULOUT

 
 

Before we began the conversion from a hybrid to a twin diesel propulsion system Seas the Day was hauled out at Lauderdale Marine Center.  After easing into the haulout slip, slings were positioned under her, the liftout crane raised her out of the water, and she was taken to her position in the boatyard.  She was then propped up on blocks, the bottom was powerwashed, and she was all ready for the French technicians to start removing the hybrid propulsion components.  Now the fun begins!